TLI: 569335.0000 - 0001

CONSTRUCTION MATERIALS and SUPPLIES, VIZ: Sealers,
Non-Hazardous, Including Concrete Sealers; Roof Drains;
Lumber; Plywood; Drywall; Doors; Windows; Nuts; Bolts;
Screws; Nails; Contact Cement; Cement In Bags; Cabinets,
Knocked Down (KD); Cabinet Hardware; Shower Doors; Sinks;
Toilets; Tiles; Grout; Hinges and/or Tools, N.O.S.
Effective 19APR2019 Filing Codes IR Filed 19APR2019
From Miami, FL, United States
To Campden Park, St Vincent and the Grenadines
Currency USD
Control No Basis Rate Ctr Type Service Min Qty Units Via Carrier Note Effective Expires
19-02042 M 3.75 SS 1,2,3,4,5 19MAY2019
19-02042 W 10.00 SS 1,2,3,4,5 19MAY2019
Notes 1: EXCEPTION to Rule 2.2: Freight Charges will be
calculated per the referenced W-rate or M-rate,
whichever produces the greater revenue.
2: NSbj to GRI (101.1).
3: EXCEPTION to Rule 2.8C: SBJ to an AES of $25.00 per B/L.
4: NSbj to Rule 6: SBJ to a Minimum Basic Freight Charge
of $65.00 per B/L.
5: NSbj to Rule 10.13: SBJ to a LSFS of $0.09 per cft or
$0.18 per cwt, whichever produces the greater revenue.

Applicable Charges

RULE: 2.8 - DOCF - COMMODITY DESCRIP. & DOC/PREP HANDLING CHARGES - B/L
RULE: 2.8C - AES - AUTOMATED EXPORT SYSTEM FILINGS & CHARGES
RULE: 2.13 - REFUSED, REJECTED OR UNCLAIMED SHIPMENTS
RULE: 2.29 - PRORATING FCL RATES TO COVER MULTIPLE B/LS
RULE: 9 - FFC - FREIGHT FORWARDER COMPENSATION - LCL/FCL
RULE: 10.1 - BAF - BUNKER SURCHARGE - LCL/FCL
RULE: 10.75 - OSVS - OPERATIONAL SERVICE VIABILITY SURCHARGE - LCL/BBK/FCL
RULE: 10.99 - PASS - UNDERLYING VOCC SURCHARGES PASSED THROUGH - FCL
RULE: 12 - ADVL - AD VALOREM PROVISIONS & CHARGES
RULE: 23.1 - THC - TERMINAL HANDLING CHARGES - cLCL/cFCL
RULE: 23.12 - LND - LANDING FEES - LCL(vgb)
RULE: 23.63 - CPUC - CONTAINER PORT USAGE CHARGE - LCL/FCL/VEH/BBK
RULE: 101.2 - GRI (GENERAL RATE INCREASE) - 14JAN2022 - LCL/FCL
RULE: 101.3 - GRI (GENERAL RATE INCREASE) - 11JAN2023 - LCL/FCL
Previous Rate

Table Of Contents