RULE: 23.66 - CUC - CHASSIS USAGE SURCHARGE Eff: 24MAY2025

Effective 24MAY2025
Filed 24APR2025
Filing Codes ICA

Control No. 25-01761
  
When Carrier is required or requested to obtain a Chassis in order to
transport a Container from or to Shipper's or Consignee's premises, a
Container Yard, a Rail Ramp or Pier/Wharf facilities, OR when Carrier is
assessed a CUC by an underlying VOCC, Carrier will make arrangements to
obtain or utilize an appropriate Chassis and will assess the Chassis Usage
Charge (CUC) for each Chassis that is provided as named below, which
charge shall be in addition to all other applicable charges.  Carrier will
assess the CUC Charge only once per Chassis used per Shipment.
  
  ON SHIPMENTS FROM/TO/THRU                CHARGE PER CHASSIS 
     PORT AND POINTS IN:      CURRENCY        PER EACH DAY
                                           CHASSIS IS PROVIDED
  --------------------------------------------------------------
   the United States
           OR                    USD              45.00
   Territories of the  
     United States:
  --------------------------------------------------------------

Table Of Contents