RULE: 10.11 - ACC - ALAMEDA CORRIDOR CHARGE - FCL Eff: 01APR2015

Effective 01APR2015
Filed 01APR2015
Filing Codes C

Control No: 050092
 
In order to recover amounts paid to railroads in connection
with the railroads' agreements with the Alameda Corridor 
Transportation Authority to assist in recovering the costs
of constructing and operating the Alameda Corridor, all
cargo moving through the ports of Los Angeles or Long Beach
that is transported by rail through or out of Southern
California (i.e. the counties of Kern, San Bernardino, San 
Luis Obispo, Santa Barbara, Ventura, Los Angeles, Orange,
Riverside, San Diego and Imperial), whether or not actually
carried over the Alameda Corridor, shall be subject to a 
charge in the following amounts:
   
{CE} EXPIRES with 30 April 2015: 
   
  20-foot container -         $ 20.00 USD
  40-foot container -         $ 39.00 USD
  40-foot hi-cube container - $ 39.00 USD
  45-foot container -         $ 44.00 USD
  48-foot container -         $ 47.00 USD
  53-foot container -         $ 51.00 USD
    
{A} EFFECTIVE on 1 May 2015: 
 
  20-foot container -         $ 23.00 USD
  40-foot container -         $ 46.00 USD
  40-foot hi-cube container - $ 46.00 USD
  45-foot container -         $ 52.00 USD
  48-foot container -         $ 52.00 USD
  53-foot container -         $ 52.00 USD
   
This charge shall be included on the bill of lading and will
be paid by the cargo interest before release of the cargo
to the consignee.

Previous Rule

Table Of Contents