RULE: 2.8 - STUFFING OF ADDITIONAL CARGO IN CONTAINERS Eff: 01MAY2002

Effective 01MAY2002
Filed 01MAY2002
Filing Codes I

Prior to loading to vessel of a shipper-packed container,
carrier may load additional cargo into such container at its
designated CFS.
    
Neither carrier nor shipper is allowed to stuff additional
cargo into shipper-packed container at CY.

Table Of Contents