RULE: 10.7 - ALAMEDA CORRIDOR CHARGE Eff: 15APR2002
| Effective | 15APR2002 |
|---|---|
| Filed | 12APR2002 |
| Filing Codes | R |
Effective 15APR2002 None In Effect Effective 01MAY2002: In order to recover amounts paid to railroads in connection with the railroads' agreements with the Alameda Corridor Transportation Authority to assist in recovering the costs of constructing and operating the Alameda Corridor, all cargo moving through the ports of Los Angeles or Long Beach that is transported by rail through or out of Southern California (i.e. the counties of Kern, San Bernardino, San Luis Obispo, Santa Barbara, Ventura, Los Angeles, Orange, Riverside, San Diego and Imperial), whether or not actually carried over the Alameda Corridor, shall be subject to a charge in the following amounts: 20-foot container - $15.00 USD 40-foot container - $30.00 USD Other Containers - $0.75 USD per linear foot This charge shall be included on the bill of lading and will be paid by the cargo interest before release of the cargo to the consignee. Replaces Previous Matter Filed 16MAR2002. Effective: 15APR2002 In order to recover amounts paid to railroads in connection with the railroads' agreements with the Alameda Corridor Transportation Authority to assist in recovering the costs of constructing and operating the Alameda Corridor, all cargo moving through the ports of Los Angeles or Long Beach that is transported by rail through or out of Southern California (i.e. the counties of Kern, San Bernardino, San Luis Obispo, Santa Barbara, Ventura, Los Angeles, Orange, Riverside, San Diego and Imperial), whether or not actually carried over the Alameda Corridor, shall be subject to a charge in the following amounts: 20-foot container - $15.00 USD 40-foot container - $30.00 USD Other Containers - $0.75 USD per linear foot This charge shall be included on the bill of lading and will be paid by the cargo interest before release of the cargo to the consignee.
