RULE: 2.8 - STUFFING OF ADDITIONAL CARGO IN CONTAINERS Eff: 01Jul1993
| Effective | 01Jul1993 |
|---|---|
| Filed | 01Jul1993 |
| Filing Codes | S |
| Case No | 008018 |
Prior to loading to vessel of a shipper-packed container, carrier may load additional cargo into such container at its designated CFS. Neither carrier nor shipper is allowed to stuff additional cargo into shipper-packed container at CY.
