TLI: 986002.2000 - 0140

SIMULATOR SYSTEMS, Consisting Of, VIZ:
Projectors, Film Storage Cabinets,
Motion Bases, Film Handling Machinery,
Control Panels, Simulator Rooms,
N.O.S., Stages, N.O.S. and Sound
Systems, N.O.S.; Cabinets, N.O.S.;
Motion Controls, N.O.S.; Hydraulic Motion
Bases, N.O.S.; Show Controls, N.O.S.;
Filters, N.O.S.; Bulbs, N.O.S.; Power Supplies, N.O.S.;
Projectors, N.O.S.; Port Frame Systems, N.O.S.;
Speaker Equipment, N.O.S.; Speakers,N.O.S.;
Mounts, N.O.S.; Walls, N.O.S.; Videos, N.O.S.;
Subwoofers, N.O.S.; Monitors, N.O.S.; Caddies, N.O.S.;
CD-ROMS, N.O.S.; Speaker Controls, N.O.S.;
Cables, N.O.S.; Film Handlers, N.O.S.;
Hoses, N.O.S.; Clamps Starters, N.O.S.;
Air Blowers, N.O.S.; And Parts, N.O.S.
Effective 16JAN1997 Filing Codes IR Filed 16JAN1997
From LAX Origin Ports
To Melbourne, Australia
Sydney, Australia
Currency USD
Control No Basis Rate Ctr Type Service Min Qty Units Via Carrier Note
PC40B 6900.00 PC YY

Applicable Charges

RULE: 2.8 - COMMODITY DESCRIPTIONS AND DOCUMENTATION
RULE: 6 - MINIMUM BILL OF LADING CHARGES
RULE: 9 - FREIGHT FORWARDER COMPENSATION
RULE: 10.1 - BUNKER SURCHARGE (BAF)
RULE: 10.2 - CURRENCY ADJUSTMENT FACTOR (CAF)
RULE: 10.10 - WAR RISK SURCHARGE (WRS)
RULE: 10.12 - INTERIM FUEL ASSESSMENT/EMERGENCY BUNKER - FROM USA
RULE: 10.35 - WEST COAST PORT CONGESTION SURCHARGE (WCPCS)
RULE: 10.88 - ALAMEDA CORRIDOR SURCHARGE
RULE: 12 - AD VALOREM RATES
RULE: 16 - HAZARDOUS CARGO
RULE: 23.1 - TERMINAL HANDLING CHARGE (THC)
RULE: 101.1 -
Previous Rate

Table Of Contents