TLI: 986002.2000 - 0081

SIMULATOR SYSTEMS, Consisting Of, VIZ:
Projectors, Film Storage Cabinets,
Motion Bases, Film Handling Machinery,
Control Panels, Simulator Rooms,
N.O.S., Stages, N.O.S. and Sound
Systems, N.O.S.; Cabinets, N.O.S.;
Motion Controls, N.O.S.; Hydraulic Motion
Bases, N.O.S.; Show Controls, N.O.S.;
Filters, N.O.S.; Bulbs, N.O.S.; Power Supplies, N.O.S.;
Projectors, N.O.S.; Port Frame Systems, N.O.S.;
Speaker Equipment, N.O.S.; Speakers,N.O.S.;
Mounts, N.O.S.; Walls, N.O.S.; Videos, N.O.S.;
Subwoofers, N.O.S.; Monitors, N.O.S.; Caddies, N.O.S.;
CD-ROMS, N.O.S.; Speaker Controls, N.O.S.;
Cables, N.O.S.; Film Handlers, N.O.S.;
Hoses, N.O.S.; Clamps Starters, N.O.S.;
Air Blowers, N.O.S.; And Parts, N.O.S.
Effective 05JAN2000 Filing Codes CR Filed 05JAN2000
From LAX Origin Ports
To Benoa, Indonesia
Currency USD
Control No Basis Rate Ctr Type Service Min Qty Units Via Carrier Note
PC20 4250.00 PC YY 1
PC40B 4750.00 PC YY 1
Notes NOTE 1: NSbj to BAF and THC.

Applicable Charges

RULE: 2.8 - COMMODITY DESCRIPTIONS AND DOCUMENTATION
RULE: 6 - MINIMUM BILL OF LADING CHARGES
RULE: 9 - FREIGHT FORWARDER COMPENSATION
RULE: 10.2 - CURRENCY ADJUSTMENT FACTOR (CAF)
RULE: 10.10 - WAR RISK SURCHARGE (WRS)
RULE: 10.12 - INTERIM FUEL ASSESSMENT/EMERGENCY BUNKER - FROM USA
RULE: 10.35 - WEST COAST PORT CONGESTION SURCHARGE (WCPCS)
RULE: 10.88 - ALAMEDA CORRIDOR SURCHARGE
RULE: 12 - AD VALOREM RATES
RULE: 16 - HAZARDOUS CARGO
RULE: 101.1 -
Previous Rate

Table Of Contents