RULE: 23.77 - PORT CONTAINER CHARGE (PCC) Eff: 30JAN2007

Effective 30JAN2007
Filed 30JAN2007
Filing Codes IC

Except as otherwise provided in individual TLIs, all
shipments moving From, To or Thru the ports named below
are SBJ to the PORT CONTAINER CHARGE specified, which
charge shall be in addition to all other applicable
charges:
     
FCL Shipments Moving
   TO/THRU: Benghazi, Libya, when moving via
              MEDITERRANEAN SHIPPING COMPANY
   are SBJ to a PORT CONTAINER CHARGE of:
   
{A}  EFFECTIVE 29 February 2007
       US$ 240.00 PC

Table Of Contents