RULE: 23.18 - CLFT - CONTAINER LIFT CHARGES - cFCL Eff: 06JAN2016

Effective 06JAN2016
Filed 06JAN2016
Filing Codes IC

Control No. 16-00097
     
Except as otherwise provided on individual web rate pages (TLIs),
shipments moving on the rates named in this Tariff Rate Section will be
SBJ to the CONTAINER LIFT CHARGE named below when Carrier is requested or
required to arrange the lifting and placing of a Container onto a Chassis
or the lifting and removal of a Container from a Chassis, which charge
shall be in addition to all other charges.
    
a. On FCL Shipments moving From or Thru POLs in PAKISTAN:
    
{A}  EFFECTIVE 5 February 2016
    
        CURRENCY   EQUIPMENT  LIFT CHARGE PER     LIFT CHARGE PER
                      SIZE    LOADED CONTAINER    EMPTY CONTAINER
                                  LIFTED              LIFTED
     -------------------------------------------------------------
    
           USD       20 Ft.        25.00               25.00
           USD       40 Ft.        35.00               35.00
           USD       45 Ft.        35.00               35.00
    
     -------------------------------------------------------------

Table Of Contents