TLI: 853690.0000 - 0001

AUTO PARTS, VIZ: Plastic Covers, Cables, Plastic Connectors,
Rod Core Chokes, Fuel Module Housings, and/or Coils, N.O.S.
Effective 25MAR2013 Expires 09MAY2013 Filing Codes CRE Filed 25MAR2013
From Sibiu, Romania
Via Bremerhaven, Germany
To El Paso, TX, United States
Via Houston, TX, United States
Currency USD
Control No Basis Rate Ctr Type Service Min Qty Units Via Carrier Note Effective Expires
ROBUH13-04361AVRAM WM 172.00 DS 1,2,3,4,5,7,8,9 09MAY2013
ROBUH13-03961AVRAM WM 172.00 SD 2,3,4,5,9,10,13 03MAY2013
ROBUH13-01980AVRAM WM 172.00 SS 2,3,4,5,6,11,12 29MAR2013
Notes 1: NSbj to Rule 23.1: SBJ to a Cargo Handling Charge of
$45.00 per B/L. SBJ to a maximum weight of 565 kgs or
a maximum cubic volume of 3.2 cbm per shipment.
2: EXCEPTION to Rule 2.8A: SBJ to an AMS of $25.00 per B/L.
3: NSbj to Rule 10.1: SBJ to a BAF of $11.00 per W/M,
as freighted.
4: NSbj to CAF, CUC, LSFS.
5: EXCEPTION to Rule 2.8: SBJ to the following DOC Fees
per B/L: a Customs Handling Fee of $130.00 and a DOCF
of $50.00.
6: NSbj to Rule 23.1: SBJ to a Cargo Handling Charge of
$45.00 per B/L.
7: SBJ to an Inland Origin Charge of EUR 825.00 per B/L.
SBJ to a maximum cubic volume of 3.2 cbm per shipment.
8: SBJ to an Inland Origin Charge of EUR 715.00 per B/L.
SBJ to a maximum cubic volume of 2.9 cbm per shipment.
Note EXPIRES with 27 April 2013.
9: NSbj to Rule 23.1: SBJ to a Container Handling Charge
of $15.00 per W/M, as freighted.
10: SBJ to an Inland Origin Charge of EUR 715.00 per B/L.
SBJ to a maximum weight of 368 kgs or a maximum cubic
volume of 2.9 cbm per shipment.
11: SBJ to an Inland Origin Charge of EUR 825.00 per B/L.
SBJ to a maximum weight of 590 kgs or a maximum cubic
volume of 3.5 cbm per shipment.
12: NSbj to Rule 23.1: SBJ to a Container Handling Charge
of $15.00 per W/M, as freighted.
13: NSbj to Rule 23.1: SBJ to a Cargo Handling Charge of
$45.00 per B/L. SBJ to a maximum weight of 368 kgs or
a maximum cubic volume of 2.9 cbm per shipment.

Applicable Charges

RULE: 1.100 - PCG-ALL - GENERAL PORT CONGESTION SURCHARGE - LCL/FCL
RULE: 2.8A - CARGO DECLARATION RULE
RULE: 2.12 - RCON - DIVERSION AND RECONSIGNMENT - LCL
RULE: 2.13 - REFUSED, REJECTED OR UNCLAIMED SHIPMENTS
RULE: 2.29 - PRORATING FCL RATES TO COVER MULTIPLE B/LS
RULE: 6 - MINIMUM BILL OF LADING CHARGES
RULE: 10.88 - ACS - ALAMEDA CORRIDOR SURCHARGE - FCL
RULE: 10.89 - LAX TRAFFIC MITIGATION FEE (PIERPASS)
RULE: 12 - AD VALOREM RATES
RULE: 16 - HAZARDOUS CARGO
RULE: 23.15 - CONTAINER FREIGHT STATION FUEL SURCHARGE (CFS-F)
RULE: 101.55 - GRI (GENERAL RATE INCREASE) - NO.EUROPE/USA (FCL OCT2010)
RULE: 101.78 - REEFER GRI (GENERAL INCREASE) - FCL
Previous Rate

Table Of Contents