TLI: 903120.0000 - 0001

PROTOTYPE TEST BENCH ASSEMBLIES, VIZ:
Mounting Frames, Power Units, Pumps,
Cooler Packages, Mountings, Bulkhead Frames,
Hydraulic Reservoirs, Exhaust Pipes, Front
Cooler Upper Isolators, Cooler Frame Lower
Isolators, Engine Front Isolators and/or Engine
Rear Isolators, N.O.S.
Effective 12DEC2012 Expires 31JAN2013 Filing Codes IRE Filed 12DEC2012
From Helsinki, Finland
To Dubuque, IA, United States
Via Norfolk, VA, United States
Currency USD
Control No Basis Rate Ctr Type Service Min Qty Units Via Carrier Note Effective Expires
FITMP12-17729ROPAN PC20 3652.00 PC YD Hapag Lloyd 1,2 31JAN2013
Notes 1: SBJ to Rule 2.4.i.
2: NSbj to BAF, CAF, CUC, DOCF, LSFS, MARPOL Fuel
Surcharge, Port Handling Charges, THC.

Applicable Charges

RULE: 1.100 - PCG-ALL - GENERAL PORT CONGESTION SURCHARGE - LCL/FCL
RULE: 2.8A - CARGO DECLARATION RULE
RULE: 2.8B - INTERNATIONAL SHIP & PORT SECURITY CHARGE (ISE / ISPS)
RULE: 2.12 - RCON - DIVERSION AND RECONSIGNMENT - LCL
RULE: 2.13 - REFUSED, REJECTED OR UNCLAIMED SHIPMENTS
RULE: 2.29 - PRORATING FCL RATES TO COVER MULTIPLE B/LS
RULE: 6 - MINIMUM BILL OF LADING CHARGES
RULE: 10.6 - PANAMA CANAL SURCHARGE (PCS)
RULE: 10.88 - ACS - ALAMEDA CORRIDOR SURCHARGE - FCL
RULE: 10.89 - LAX TRAFFIC MITIGATION FEE (PIERPASS)
RULE: 12 - AD VALOREM RATES
RULE: 23.15 - CONTAINER FREIGHT STATION FUEL SURCHARGE (CFS-F)
RULE: 101.78 - REEFER GRI (GENERAL INCREASE) - FCL
Previous Rate

Table Of Contents