TLI: 842722.4120 - 0005

LIFT TRUCKS and PARTS, N.O.S.
Effective 30JAN2015 Expires 31DEC2015 Filing Codes IRE Filed 30JAN2015
From New Bremen, OH, United States
Via USWC Origin Ports
To Shanghai, China
Currency USD
Control No Basis Rate Ctr Type Service Min Qty Units Via Carrier Note Effective Expires
MSP15-00750OLIVO WM 56.00 DD 1,2,3,4,5,6,7,8 01FEB2015 31DEC2015
MSP15-00750OLIVO PC20 1600.00 PC DD 2,3,9,10,11,12,13 01FEB2015 31DEC2015
MSP15-00750OLIVO PC40B 1750.00 PC DD 2,3,9,10,11,12,13,14 01FEB2015 31DEC2015
MSP15-00750OLIVO PC40B 2160.00 PC DD COSCO 2,3,9,10,11,12,13,14,15 01FEB2015 31DEC2015
MSP15-00750OLIVO PC40 2985.00 OT DD Maersk 1,2,3,9,10,11,12,14,15,16 01FEB2015 31DEC2015
Notes 1: NSbj to ACS, CCAM, CUC, ENS, IFS, ISPS, LSFS, PCS,
PDS, TMF, WRS.
2: EXCEPTION to Rule 2.1 & 2.4: NSbj to Origin or
Destination Wharfage Charges.
3: NSbj to GRI (101.106).
4: SBJ to an Inland Origin Charge of $66.56 per B/L.
SBJ to a maximum weight of 89,939 kgs per shipment.
5: EXCEPTION to Rule 2.8: SBJ to the following DOC Fees per
B/L: an Origin Documentation Handling Charge of 105.00
and a Destination Documentation Handling Charge of
$85.52.
6: SBJ to an Inland Destination Charge of $27.69 per B/L.
SBJ to a maximum weight of 89,939 kgs per shipment.
7: NSbj to Rule 23.1: SBJ to a DTHC of $43.17 per B/L.
SBJ to a maximum weight of 89,939 kgs per shipment.
8: NSbj to Rule 10.1: SBJ to a BAF of $5.00 per W/M,
as freighted.
9: SBJ to an Inland Origin Charge of $525.00 PC.
10: EXCEPTION to Rule 2.8: SBJ to the following DOC Fees per
B/L: an Origin Documentation Handling Charge of 65.00
and a Destination Documentation Handling Charge of
$114.03.
11: SBJ to an Inland Destination Charge of $203.63 PC20,
$280.19 PC40B and $280.19 OT40.
12: NSbj to Rule 23.1: SBJ to a DTHC of $231.32 PC20,
$333.95 PC40B and $382.82 OT40.
13: NSbj to ACS, CCAM, CUC, ENS, IFS, ISPS, LSFS, PCS,
PDS, TMF, WRS, BAF.
14: NSbj to Rule 2.39: Except as otherwise noted, if only
a PC40 Rate is provided, Carrier will transport shipments
in PC40B Equipment at the same rate and charges as
the rate and charges for PC40 Equipment; and if
only a PC40B Rate is provided, Carrier will transport
shipments in PC40 Equipment at the same rate and
charges as the rate and charges for PC40B Equipment.
15: SBJ to Rule 2.4.i.
16: NSbj to Rule 10.1: SBJ to a BAF of $570.00 OT40.

Applicable Charges

RULE: 1.100 - PCG-ALL - GENERAL PORT CONGESTION SURCHARGE - LCL/FCL
RULE: 2.8 - DOCs - COMMODITY DESCRIPTIONS AND DOCUMENTATION - LCL/vFCL
RULE: 2.8Q - ACI - CANADIAN ACI FILINGS ON US LOADED FROB CARGO - LCL/FCL
RULE: 2.8S - BLS - BILL OF LADING SECURITY CHARGES - LCL
RULE: 2.11 - ADVANCED CHARGES RULE
RULE: 2.12 - RCON - DIVERSION AND RECONSIGNMENT - LCL
RULE: 2.13 - REFUSED, REJECTED OR UNCLAIMED SHIPMENTS
RULE: 4 - HEAVY LIFT CARGO SERVICE & CHARGES
RULE: 5.3 - EXL - OVER/EXTRA LENGTH CARGO HANDLING & CHARGES - oLCL
RULE: 6 - MINIMUM BILL OF LADING CHARGES
RULE: 9 - FREIGHT FORWARDER COMPENSATION
RULE: 10.15 - IFS - INLAND FUEL SURCHARGE - vFCL
RULE: 10.51 - DENSITY SURCHARGE - LCL BREAKBULK SHIPMENTS
RULE: 10.66 - EIS - EQUIPMENT IMBALANCE SURCHARGE - vFCL
RULE: 12 - AD VALOREM RATES
RULE: 16 - HAZF - TRANSPORTATION OF HAZARDOUS CARGO - LCL
RULE: 23.5 - XDBL- CHARGE WHEN DOUBLE STACKING OF CARGO PROHIBITED - LCL
RULE: 23.9 - WFGU - WHARFAGE CHARGES AT U.S. PORTS - vFCL
RULE: 101.108 - GRI (GENERAL RATE INCREASE) - FEB.2015 - LCL/FCL
RULE: 101.113 - GRI (GENERAL RATE INCREASE) - MAR.2015 - LCL/FCL
RULE: 101.114 - GRI (GENERAL RATE INCREASE) - APR.2015 - LCL/FCL
RULE: 101.115 - GRI (GENERAL RATE INCREASE) - APR.2015 - LCL/FCL
RULE: 101.129 - GRI (GENERAL RATE INCREASE) - FEB.2016 - LCL/FCL
Previous Rate

Table Of Contents