TLI: 314211.0000 - 0001

ENDURANCE TESTING EQUIPMENT AND/OR PARTS, VIZ: Monitor
Screens, Multiplexer Units, Power Relay Switch Units,
Wiring Card Boards, Computers, Probes, Modules,
Splitter Boxes, Power Relay Cards, Fuses, Breaker
Switches, Temperature Recorders, Keyboards and/or
Voltage, Current, and/or Resistance Testing Apparatus
Without Recording Devices, N.O.S.
Effective 20SEP2012 Expires 31DEC2012 Filing Codes IRE Filed 20SEP2012
From Detroit, MI, United States
Via Los Angeles, CA, United States
To Shanghai, China
Currency USD
Control No Basis Rate Ctr Type Service Min Qty Units Via Carrier Note Effective Expires
DTW12-13560GORNO WM 127.00 SS 1,2 31DEC2012
Notes 1: NSbj to ACS, BAF, CUC, DOCF, EFAF/EBS, IFS.
2: NSbj to GRI (101.13, 101.23, 101.35, 101.65).

Applicable Charges

RULE: 1.100 - PCG-ALL - GENERAL PORT CONGESTION SURCHARGE - LCL/FCL
RULE: 2.8B - INTERNATIONAL SHIP & PORT SECURITY CHARGE (ISE / ISPS)
RULE: 2.8C - AUTOMATED EXPORT SYSTEM FILINGS & CHARGES (AES)
RULE: 2.8E - ENS - SHIPMENTS VIA/THRU/FROB EUROPEAN UNION PORTS - LCL/FCL
RULE: 2.8Q - ACI - CANADIAN ACI FILINGS ON US LOADED FROB CARGO - LCL/FCL
RULE: 2.11 - ADVANCED CHARGES RULE
RULE: 2.12 - RCON - DIVERSION AND RECONSIGNMENT - LCL
RULE: 2.13 - REFUSED, REJECTED OR UNCLAIMED SHIPMENTS
RULE: 4 - HEAVY LIFT CARGO SERVICE & CHARGES
RULE: 5 - EXTRA LENGTH CARGO SERVICE & CHARGES
RULE: 6 - MINIMUM BILL OF LADING CHARGES
RULE: 9 - FREIGHT FORWARDER COMPENSATION
RULE: 10.6 - PANAMA CANAL SURCHARGE (PCS)
RULE: 10.51 - DENSITY SURCHARGE - LCL BREAKBULK SHIPMENTS
RULE: 10.89 - LAX TRAFFIC MITIGATION FEE (PIERPASS)
RULE: 12 - AD VALOREM RATES
RULE: 16 - HAZARDOUS CARGO
RULE: 16.1 - HAZARDOUS CARGO - USA RAIL SERVICE SURCHARGE
RULE: 101.54 - GRI (GENERAL RATE INCREASE) - USA/ASIA (FCL APR2010)
RULE: 101.75 - GRI (GENERAL RATE INCREASE) - NOV.2012, USA/FAR EAST - FCL
RULE: 101.78 - REEFER GRI (GENERAL INCREASE) - FCL
RULE: 101.80 - GRI (GENERAL RATE INCREASE) - JAN2013 - USA/FAR EAST - FCL
Previous Rate

Table Of Contents